Tuesday, 22 July 2008

Last year's contour survey and general plan of main sites on the moraine at Serre de l'Homme

The plan shown here presents a contour survey of the moraine and the situation of Serre de l'Homme XI (and the two phases of activity based on 14C dates). Excavations continued on this site, as well as on Serre de l'Homme XIX to the east. A new series of structures was also surveyed, and the digital terrain model was extended in all directions.
Posted by Picasa

No comments: